Official Franklin survey plats confirm the 92.58-acre Canary farm directly behind Winterfield & Heritage is already zoned Light Industrial (IL)—just 25 feet from our backyards. Whether D.R. Horton, an industrial developer, or the City steps in, we can require the eastern buffer strip to become Canary Airfield Park—protecting our home values (+5% to +20% vs. a -15% to -25% warehouse drop) using $1.5M+ in dedicated developer Park Impact Fees ($0 new taxes) generated by our neighborhoods.
Every signature and email shows Mayor Steve Barnett, Parks Superintendent Chip Orner, the Franklin Park Board, and the Canary Estate that our community stands united for Canary Airfield Park.
Presented to the Franklin Park Board & Common Council
Pre-addressed to the Mayor, Parks Supt., Planning Director & City Engineer
We don't need an extravagant build or mock runway—just a clean, practical neighborhood park that leaves plenty of budget to build the playground, public restrooms, and parking lot. A bronze memorial plaque on an Indiana limestone boulder and an airplane-themed playground will thoughtfully honor lifelong landowners Raymond Eugene "Gene" Canary (1928–2024) and U.S. Air Force veteran Terry Lee Canary (1950–2026).
A 1947 Alva Neal High School graduate and lifelong Franklin farmer, Gene built his own open-cockpit biplane, maintained the 2,500-ft grass airstrip (Canary's Airport, 20IN), and restored historic U.S. military artifacts for Grissom & Dover Air Force Bases.
A 1968 Franklin Community High School graduate and United States Air Force Veteran (1971–1974). For years, Terry also served at Camp Atterbury & Muscatatuck as the #1 Citizen on the Battlefield (COB) helping train deploying U.S. troops.
A simple, dignified limestone boulder & bronze plaque ($4k–$8k) beside a cheerful airplane-themed neighborhood playground ($150k–$275k), a brick restroom/shelter pavilion, and a 25–40 space parking lot.
Preserves the natural wetlands along Canary Creek to capture stormwater runoff from western Winterfield while maintaining a hardwood tree buffer that boosts nearby home values by +5% to +20%.
We verified the exact parcel boundaries using the official ALTA/NSPS Land Title Survey and Primary/Secondary Plats filed with the City of Franklin Plan Commission. Click any map below to inspect full-screen:
Shows Winterfield (foreground) sharing a 1,366.87-foot western tree line with the 92.58-acre Canary Property extending west to N. Graham Road, where industrial warehouses already stand.
Survey Sheet C100 & C107 explicitly label the neighbor behind Lots 246–262 as: "Now or Formerly Raymond Eugene & Terry Lee Canary | Instr. No. 2007-012267 | Zoning: IL" with only a 25-ft buffer.
Central, South, and West Franklin enjoy 6+ city parks (including the Sept 8, 2026 RDC transfer for Scott Park), while 600+ homes in Winterfield & Heritage have ZERO public parks.
Because the Canary tract is already zoned IL (Light Industrial), an industrial developer does not need a rezoning vote to build concrete freight warehouses 25 feet from residential fences.
Peer-reviewed real estate appraisal studies (National Recreation and Park Association / Crompton Hedonic Pricing Studies and Journal of Real Estate Finance and Economics) document a massive $70,000 to $157,500 net equity swing for a typical $350,000 Winterfield or Heritage home depending on what gets built on the Canary buffer:
According to Dr. John Crompton's "The Proximate Principle" (NRPA / Texas A&M University), homes within 500–1,500 feet of a passive neighborhood park with walking trails, wetlands, and a playground command a consistent +5% to +20% resale premium:
Industrial disamenity studies confirm that siting 40-ft tilt-up concrete logistics warehouses and 24/7 semi-truck docks immediately adjacent to single-family subdivisions inflicts immediate, permanent equity losses:
The City of Franklin does not need to spend its entire $1.5M+ Park Impact Fee balance buying all 92.58 acres at top-dollar industrial prices—which would leave zero money to build the playground, restrooms, or parking lot. Instead, the City has three powerful legal mechanisms to force whoever wants the Canary property (whether D.R. Horton, an industrial developer, or a conservation partner) to dedicate or sell the 15–25 acre eastern buffer strip along Winterfield, leaving $650,000 to $1,100,000+ in cash to build the park right away:
Because the Canary farm is zoned IL (Light Industrial), D.R. Horton or any residential builder cannot build a single house without a rezoning vote from the Franklin Plan Commission and Common Council.
IL to RS-2/PUD, the City requires the builder to deed the eastern 15–25 acres (300–500 ft wide) along the 1,366.87-ft Winterfield border to Franklin Parks for $0.
The easternmost 15–25 acres along Winterfield & Canary Ditch contain Wetlands D & F, the WOTUS stream channel, and poorly drained Brookston clay soils receiving 24.44 acres of Winterfield runoff—making that strip the hardest and most expensive part for any developer to build on.
Even under existing IL zoning, an industrial developer cannot pour a single footing without Technical Review Committee (TRC) & Johnson County Drainage Board approval.
No expensive mock runway needed—just a dignified bronze memorial plaque on an Indiana limestone boulder, an airplane-themed neighborhood playground, public restrooms & picnic shelter, a 25–40 space parking lot, and walking trails:
| Park Component | Practical Scope & Specifications | Modest Build | Signature Build |
|---|---|---|---|
| 1. Canary Memorial Plaque & Boulder | Cast bronze plaque mounted on an Indiana limestone boulder at the trailhead honoring Gene Canary (1928–2024), USAF Vet Terry Canary (1950–2026), & FAA Canary Airfield (20IN) |
$4,000 | $8,000 |
| 2. Airplane-Themed Playground | Commercial municipal play structure (central toy biplane climber, swings, slides for ages 2–5 & 5–12) + poured-in-place rubber ADA safety surfacing & benches | $150,000 | $275,000 |
| 3. Public Restrooms, Shelter & Utilities | Permanent masonry/pre-cast 2-stall ADA family restroom building + covered picnic pavilion + water, sanitary sewer, & electrical hookups | $190,000 | $335,000 |
| 4. 25–40 Space Asphalt Parking Lot | Paved entrance drive, 25–40 striped spaces, ADA van spaces, concrete curbs, and dark-sky LED bollard lighting | $85,000 | $145,000 |
| 5. Paved Walking Loop, Pond & Tree Buffer | 8-ft wide ADA asphalt perimeter trail (~0.75–1.0 mi), wetland retention grading for Basins J & F, native shade trees, & 10% engineering/permitting | $220,000 | $350,000 |
| TOTAL TURNKEY PARK & PLAYGROUND CONSTRUCTION COST | $649,000 | $1,113,000 | |
We created a dedicated Deep-Dive Engineering & Survey Evidence Portal featuring high-resolution boundary close-ups from PC 2022-04 & PC-24-14, Stoeppelwerth's stormwater drainage basin maps (Basins J & F), Earth Source's wetland delineation field photos (Wetlands D & F), FAA airfield records (20IN), and 1-click downloads of all 6 official City of Franklin PDF filings.
Under Franklin's Park Impact Fee Ordinance, homebuilders pay a mandatory $2,490 fee per single-family home as building permits are pulled. Across Winterfield (320 lots) and Heritage (300+ homes), our neighborhoods will have generated over $1.5 Million. By Indiana state law, those funds cannot be used for general city expenses or road paving—they are 100% legally restricted to new parkland and recreation infrastructure serving the growth area.